CSIR NET June 2021 Q90: Isostasy

Isostatic rebound/subsidence timing.
An 8 km root supports h = 8 × 0.3/2.7 ≈ 0.889 km of topography. The 1.0 km landmass must subside ≈ 111 m. At 5 cm/century (0.5 mm/yr): 111/0.0005 ≈ 2.2 × 10⁵ yr ≈ 0.2 Myr (option 1).
2, 3, 4: Wrong compensation height.
