2015_june Booklet A Part C Q89 📚 Earth Science - Geophysics (Gravity Method, Mass Estimation)

CSIR NET June 2015 Q89: Geophysics (Gravity Method, Mass Estimation)

hard
Question 89

Select your answer:

Estimating total excess mass of a buried ore body from a gridded Bouguer gravity anomaly survey using Gauss's flux theorem.
Gauss's theorem for gravity gives the total excess mass as M = (Area x sum of anomaly values)/(2*pi*G), where the grid-summed anomaly approximates the surface integral of the vertical gravity anomaly. Using grid cell area A = (20 m)^2 = 400 m^2, summed anomaly = 22 mGal = 22x10^-5 m/s^2 = 2.2x10^-4 m/s^2, and G = 6.674x10^-11 m^3 kg^-1 s^-2: M = (400 x 2.2x10^-4)/(2*pi*6.674x10^-11) = 0.088/4.193x10^-10 ~ 2.10x10^8 kg = 2.10x10^5 tonnes = 21x10^4 tonnes. This is well above 6.3x10^4 tons.
Option 4 (greater than 6.3x10^4 tons) is correct, since the Gauss's theorem mass estimate of ~21x10^4 tons clearly exceeds this threshold. Options 1-3 (less than 2.1, close to 4.1, close to but less than 6.3, all x10^4 tons) all understate the mass implied by the summed gravity anomaly.
error: Content is protected !!
Chat on WhatsApp